Experience an Animal Adventure
Video Book
For Mac and iPads only
Now available
For iPhones with iOS 8.4
Video Book
For Mac and iPads only
Now available
For iPhones with iOS 8.4
Dry Gas Rate Calculator
Dry Gas Rate Calculator
An oil field tool in the palm of your hand. This app can be used by engineers, company men, well testers, pumpers and even helpers to calculate dry gas rates. This amazing easy to use oilfield app works its math, in any direction. No keyed in data, all entries are dialed in with a scroll or by an adjustable slider bar. Whether you need to know the choke size or the gas rate. The answers are immediately displayed. Gas rates are displayed in MCF/D. |
Direction
- Scrolling in the tubing pressure (psi/g).
- Us the slider bar to adjust choke sizes Choke sizes are based on a 1” choke.
- Closed = 0/64 - open = 64/64.
- The gas rate will be immediately displayed in MCF/D
Upstream pressure must be more then twice downstream pressure. PSIG
Acoustic Velocity
(From Petroleum Engineers Handbook)
A wellhead choke is used to control the production rate from a well. In the design of tubing and well completions (perforations, etc.), the engineer must ensure that neither tubing nor perforations control the production from the well the flow capacity of the tubing and perforation should always be grater than the flow performance behavior of the reservoir.
Wellhead chokes are selected so that fluctuation in the line pressure downstream of the choke have no effect on the well flow rate to ensure this condition, flow through the choke must be at critical flow conditions; this is, flow through the choke is at the acoustic velocity. For this condition to exist, downstream pressure must be approximately 0.55 or less of the tubing or upstream pressure. Under these conditions, the flow rate is a function of the upstream or tubing pressure only.
Acoustic Velocity
(From Petroleum Engineers Handbook)
A wellhead choke is used to control the production rate from a well. In the design of tubing and well completions (perforations, etc.), the engineer must ensure that neither tubing nor perforations control the production from the well the flow capacity of the tubing and perforation should always be grater than the flow performance behavior of the reservoir.
Wellhead chokes are selected so that fluctuation in the line pressure downstream of the choke have no effect on the well flow rate to ensure this condition, flow through the choke must be at critical flow conditions; this is, flow through the choke is at the acoustic velocity. For this condition to exist, downstream pressure must be approximately 0.55 or less of the tubing or upstream pressure. Under these conditions, the flow rate is a function of the upstream or tubing pressure only.
Mission Statement
Creating opportunities, by exercising our minds along with our God given talents. Striving to become more today than we were yesterday. Building a platform to develop and launch new ideas and products that will help people of all ages and skill levels. User friendly software, with eye catching unique graphics. While creating an environment that will empower our employees to become masterminds of great ideas, taking them to the highest levels.
"Creating products that are a beacon for mankind"
Giving birth to a company that will produce great products, and great people with no limits to there earning potential. Giving them ownership of their dreams, ideas and future.
A guiding light company, illuminating the future.
"Creating products that are a beacon for mankind"
Giving birth to a company that will produce great products, and great people with no limits to there earning potential. Giving them ownership of their dreams, ideas and future.
A guiding light company, illuminating the future.